Design of external gas supply networks

Design of external engineering networks for gas supply, carried out in accordance with DNAOP 0.00-1.20-98 «Safety rules of gas supply systems of Ukraine», «Rules for supplying and using natural gas in the national economy of Ukraine», DBN В.2.5-41:2009 "Gas pipelines from polyethylene pipes», as well as according to the technology of the equipment manufacturer, taking into account the wishes of the reserve, fixed in the design specification.

The project of external engineering networks for gas supply includes:

проектирование наружных инженерных сетей газоснабжения
  • Explanatory note;
  • Topographic and geodetic plan of external gas pipeline networks (network tracing);
  • Hydraulic calculation;
  • Specification of equipment and materials;

The design of external engineering gas supply networks is usually carried out in conjunction with boiler house design, heating system design, water supply and sewerage design. In the process of designing internal engineering networks, specialists of VK (water supply and sewerage), HV (heating and ventilation), PS (power supply) and low-voltage networks approve intersections among themselves and issue the final version of their sections of projects to construction and installation organizations.

Required technical data for the design of internal gas supply systems:

  • Locations of gas supply devices (boiler, rooftop (ROOFTOP), radiant heaters of gas stoves;
  • Desired places for laying gas supply risers;

Design of external engineering networks of gas supply

Design of external engineering gas supply networks during the construction of a new residential building (house), industrial enterprise, administrative premises usually performed in conjunction with boiler house design, heating system design, water supply and sewerage design, heating network design. To connect to gas supply networks, it is necessary to obtain technical conditions from the gas supply organization. We offer the service "obtaining technical specifications on a turnkey basis", the cost for each object is different, for example, to obtain technical specifications for a private house up to 200 sq.m. cost UAH 5500.00(excluding official payments for the issuance of specifications), for other gas supply facilities, the price of services is calculated individually. You can get the technical conditions yourself if you have the documents shown below.

Documents required to obtain technical specifications:

  • Letter addressed to the director of the organization that supplies gas (for Kyiv - PJSC "Kyivgaz") an example of a letter;
  • Questionnaire (filled out by the design organization), private individuals, as a rule, are prompted in Oblgaz on the spot;
  • Contract for the lease of premises.
  • Plan on a scale of 1:2000 showing the building to be connected to the gas supply network.
  • A completed form with payer details.

After receiving the technical specifications, we can calculate the cost of design work, taking into account the implementation of topographic and geodetic and geological surveys, coordination with all interested authorities. The development of a project for connection to gas supply networks is carried out on the basis of DBN V.2.5-20-2001 “Gas supply”, DNAOP 0.00-1.20-98 “Rules for the safety of gas supply systems in Ukraine”, DSTU B V.2.5-29:2006 “Gas supply system. Underground steel gas pipelines. Zagalni vimogi to zakhistu vіd korozії”, “Rules for the supply and selection of natural gas in the people's state of Ukraine”, DBN. V.2.5-41:2009 "Gas pipelines from polyethylene pipes".

If you have any questions please call +38(068)154-1212, +38(067)467-5677 , You can also use the “call me back” service, after filling out the application, a specialist of our company will contact you.

Copyright © 2023 MC Engineering Inc. All rights reserved. Privacy Policy Terms of Use Sales and Refunds Site Map
Имя: Телефон: Сообщение: